Asphalt Mix Cost

Please fill in information on yellow highlighted cells.

Materials Cost / Costo Materiales

Aggregates / Agregados

$

/ton

Sand/Arena

$

/ton

Liquid Asphalt

$

/ton

Fuel / Combustible

$

/gal

Mix Design / Formula

Sand/Arena %

%

Aggregate / Agregado %

%

Asphalt/Bitumen %

%

Total:

%

Total MUST add up to
Formula DEBE de sumar

%

>
% left for the formula
% pendiente en la formula

%

Additional Information/ Informacion Adicional

Heat Requirement Poder Calorifico Requerido

BTU/ton

#2 oil heating value Valor de combustible #2

BTU/ton

Depreciation Depreciacion

Annual Production (tons) Produccion Anual (tons)
Cost of Equipment Costo del Equipo $
Life of Loan(years): Tiempo de finansiacion (anos)
Residual Value of Equipment Valor Residual del Equipo %

Results WITHOUT additional Info. & depreciation
Resultados SIN Info. adicional y depreciación

Aggregates / Agregados

$

13.68
Sand / Arena

$

2.83
Fuel / Combustible

$

6.78
Asphalt / Bitumen

$

22.00
Total Projected Cost/Ton:

$

45.29

Results WITH additional Info. & depreciation
Resultados CON Info. adicional y depreciación

Aggregates / Agregados

$

13.68
Sand / Arena

$

2.83
Fuel / Combustible

$

6.78
Asphalt / Bitumen

$

22.00
Maintenance / Mantenimiento

$

Labor / Mano De Obra

$

Electric Power/ Electricidad

$

Depreciation/ Depreciacion

$

22.50
Total Projected Cost/Ton:

$

71.55